All Questions
Evals And Observability easy

A prompt change produced an impressive answer in a live demo for leadership. The PM wants to ship it today. What should you do?

  1. A Run the change against the existing eval set and compare scores with the current prompt before shipping it.
  2. B Ship it, because a strong result on a realistic live input is good evidence that the prompt generalizes well.
  3. C Rerun the same demo input five more times and ship it if the output stays impressive in every single run.
  4. D Ship it behind a feature flag and skip the offline eval, since online metrics are the real ground truth anyway.

One system design question a day, with spaced repetition so the ones you miss come back.

Get the app

Related questions